在质量管理体系的严格控制下,产品质量稳定,经政府主管部门多次监督抽查,合格品率100% 。 我公司“以质量为生存之本、以信誉为发展之源”为宗旨。愿为各界同仁精诚合作,共同发展,用我们的聪明才智和辛勤劳动创造中国路桥事业更加辉煌的明天。 衡水瑞博工程橡胶有限公司的诚信、实力和产品质量获得业界的认可。欢迎各界朋友莅临参观、指导和业务洽谈。
Under the strict control of the quality management system, the quality of the products is stable, and the quality of the qualified products is 100% after a number of supervision and inspection by the government departments. Our company "takes the quality as the basis for survival and the source of credit for the development". We are willing to cooperate with all the colleagues and develop together, with our ingenuity and hard work to create a more brilliant future for the cause of China's Luqiao. Hengshui Ruibo Rubber Engineering Limited company integrity, strength and quality of products recognized by the industry. Welcome friends from all walks of life to visit, guide and business negotiation.
中埋式橡胶止水带特点:橡胶止水带和止水橡皮系以天然橡胶与各种合成橡胶为主要原料,掺加各种助剂及填充料,经塑炼、混炼、压制成型,其品种规格较多,有桥型、山型、P型、U型、Z型、乙型、T型、H型、E型、Q型等。根据使用情况又可分类为埋式橡胶止水带和背贴式橡胶止水带。该止水材料具有良好的弹性,耐磨性、耐老化性和抗撕裂性能,适应变形能力强、防水性能好,温度使用范围为-45℃-+60℃.当温度超过70℃,以及橡胶止水带受强烈的氧化作用或受油类等有机溶剂侵蚀时,均不得使用橡胶止水带。一般常在地下室外墙和后浇带施工时使用。
In the bded rubber water stop belt features: rubber sealing strip and sealing rubber, natural rubber and various synthetic rubber as the main raw material, and the filling material mixed with various additives, through plasticizing, mixing, molding, the more varieties of different specifications, bridge, mountain type, P type, U type, Z type, B, T type, H type, E type, Q type etc.. According to the use, it can be classified into buried rubber water stop belt and back sticking rubber water stop belt. The sealing material has good elasticity, abrasion resistance, aging resistance and tear resistance to debation ability, good waterproof perbance, temperature range of -45 DEG -+60 DEG. When the temperature exceeds 70 degrees Celsius, and the rubber sealing strip by strong oxidation or by oil and other organic solvent erosion, shall the use of rubber sealing strip. Generally, it is often used in the construction of the exterior wall of the basement and the post pouring belt.